Florence JR/SR High School
Track and Field Replacment

CLIENT: Fremont Re-2 School District

PROJECT: Florence JR/SR High School Track

SUB-PROJECT OF: Fremont RE-2 2022 Bond Projects

PUBLIC/PRIVATE PROJECT: Public Project

MARKET SECTOR: Educational

BUILDING CLASSIFICATION: Athletic Fields -- K-12 Education

PROJECT COST: $3,480,424.00

DELIVERY METHOD: Design Build

Florence JR/SR High School Track – Fremont RE-2 School District

As part of the Fremont RE-2 2022 Bond Projects, iiCON Construction and CSNA Architects were selected to lead the reconstruction of the track and field at Florence JR/SR High School. The original facility, which had suffered from long-term settlement issues, had been unusable for nearly two decades. Our team partnered with the district to completely remove the existing surface and over-excavated the subgrade eight feet to install structural fill, correcting underlying soil conditions. The new facility includes a synthetic turf field, improved drainage systems, a rebuilt retaining wall, and efficient LED lighting to replace outdated fixtures. This revitalized track and field enhances safety and usability for students and the broader community.

Track and Field Gallery

Related Articles